原創|使用教程|編輯:郝浩|2013-05-30 15:19:57.000|閱讀 688 次
概述:
一個甘特圖包含左邊和右邊2個部分,左邊部分就是樹表。FlexGantt這個設置讓我們創建填充表格數據。
# 界面/圖表報表/文檔/IDE等千款熱門軟控件火熱銷售中 >>
一個甘特圖包含左邊和右邊2個部分,左邊部分就是樹表。FlexGantt這個設置讓我們創建填充表格數據。
DefaultGanttChartModel model = (DefaultGanttChartModel) gc.getModel();
DefaultGanttChartNode root = (DefaultGanttChartNode) model.getRoot();
DefaultGanttChartNode node1 = new DefaultGanttChartNode("Node 1"); DefaultGanttChartNode node2 = new DefaultGanttChartNode("Node 2"); DefaultGanttChartNode node3 = new DefaultGanttChartNode("Node 3"); node1.setKey("Key 1"); node2.setKey("Key 2"); node3.setKey("Key 3"); root.add(node1); root.add(node2); root.add(node3);
model.nodeStructureChanged(root);
DefaultGanttChartNode node21 = new DefaultGanttChartNode("Node 21"); DefaultGanttChartNode node22 = new DefaultGanttChartNode("Node 22"); DefaultGanttChartNode node23 = new DefaultGanttChartNode("Node 23"); DefaultGanttChartNode node24 = new DefaultGanttChartNode("Node 24"); DefaultGanttChartNode node25 = new DefaultGanttChartNode("Node 25"); node21.setKey("Key 21"); node22.setKey("Key 22"); node23.setKey("Key 23"); node24.setKey("Key 24"); node25.setKey("Key 25"); node2.add(node21); node2.add(node22); node2.add(node23);
最后整個設置完成代碼:
/** * Copyright 2006 - 2008 * Dirk Lemmermann Software & Consulting * //www.dlsc.com */ package com.dlsc.flexgantt.examples.jumpstart; import javax.swing.JFrame; import com.dlsc.flexgantt.model.gantt.DefaultGanttChartModel; import com.dlsc.flexgantt.model.gantt.DefaultGanttChartNode; import com.dlsc.flexgantt.swing.GanttChart; import com.dlsc.flexgantt.swing.GanttChartFrame; /** * One of the steps used for the 'Jumpstart' tutorial. The step will create a * couple of tree nodes and add them to the Gantt chart. * * @author Dirk Lemmermann */ public class Step2_Tree_Nodes { /** * The application‘s entry point. Page 5 ! FlexGantt - Getting Started */ public static void main(String[] args) { /* * Create a basic Gantt chart, which will use the default Gantt chart * model. The default model itself will use the default Gantt chart node * as a root object. */ GanttChart gc = new GanttChart(); /* * Retrieve the default model and node from the Gantt chart. */ DefaultGanttChartModel model = (DefaultGanttChartModel) gc.getModel(); DefaultGanttChartNode root = (DefaultGanttChartNode) model.getRoot(); /* * Add new nodes to the model and trigger an event so that the UI will * update its state. */ DefaultGanttChartNode node1 = new DefaultGanttChartNode("Node 1"); DefaultGanttChartNode node2 = new DefaultGanttChartNode("Node 2"); DefaultGanttChartNode node3 = new DefaultGanttChartNode("Node 3"); node1.setKey("Key 1"); node2.setKey("Key 2"); node3.setKey("Key 3"); root.add(node1); root.add(node2); root.add(node3); model.nodeStructureChanged(root); // the event /* * Add more nodes to node2. */ DefaultGanttChartNode node21 = new DefaultGanttChartNode("Node 21"); DefaultGanttChartNode node22 = new DefaultGanttChartNode("Node 22"); DefaultGanttChartNode node23 = new DefaultGanttChartNode("Node 23"); DefaultGanttChartNode node24 = new DefaultGanttChartNode("Node 24"); DefaultGanttChartNode node25 = new DefaultGanttChartNode("Node 25"); node21.setKey("Key 21"); node22.setKey("Key 22"); node23.setKey("Key 23"); node24.setKey("Key 24"); node25.setKey("Key 25"); node2.add(node21); node2.add(node22); node2.add(node23); node2.add(node24); node2.add(node25); model.nodeStructureChanged(node2); // another event /* * Add the Gantt chart to a specialized frame class. The frame will * automatically add a status bar and a glass pane (used for updating * the cursor when commands get executed). */ GanttChartFrame<GanttChart> frame = new GanttChartFrame<GanttChart>( "Step 2", gc); frame.setDefaultCloseOperation(JFrame.EXIT_ON_CLOSE); /* * Show the frame. The split panel inside the Gantt chart will adjust * to the preferred size of the left-hand side (the tree table). */ frame.setVisible(true); } }
設置后的教程應用程序